Muthiah A, and Ganesan K. 2015. “PRODUCTION SCHEDULING PROBLEM SOLVING USING GENETIC AND GREEDY ALGORITHMS WITH SEQUENCE- DEPENDENT SET-UP TIMES”. Journal of Manufacturing Engineering 10 (3):166-70. https://smenec.org/index.php/1/article/view/232.