“CYCLE TIME REDUCTION IN ECONOMIZER MANUFACTURING USING 5S TECHNOLOGY: A CASE STUDY” (2014) Journal of Manufacturing Engineering, 9(4), pp. 242–252. Available at: https://smenec.org/index.php/1/article/view/260 (Accessed: 22 August 2025).