CYCLE TIME REDUCTION IN ECONOMIZER MANUFACTURING USING 5S TECHNOLOGY: A CASE STUDY

Authors

  • Kumaravadivel A Departmentof mechanical engineering,M.I.E.T Engineering College Tiruchy
  • Mahadevan K Departmentof mechanical engineering,M.I.E.T Engineering College Tiruchy
  • Azhagarsamy R Department of mechanical engineering,M.I.E.T Engineering College Tiruchy
  • Arun Xavier A Department of mechanical engineering,M.I.E.T Engineering College Tiruchy

Keywords:

5S, cycle time, boiler parts manufacturing

Abstract

5S is a systematic technique used by organizations comes from five Japanese words. This system helps to organize a workplace for efficiency and decrease wasting and optimize quality and productivity via monitoring an organized environment. It also provides useful visual evidences to obtain more firm results. There is a real need for empirical studies in field of new management systems and their impact on company’s performance. A case study has been carried out at Veesons Energy Systems Pvt. Ltd in Trichy, pioneer in boiler parts manufacturing. The company faces lot of problems in cycle time and process delay, intern the profit also getting reduced. As importance role of continuous improvement in today’s organizations, and lack of sufficient evidence to show the positive impact of 5S on organizational performance, this paper aims to determine performance factors and characteristics in industrial organizations and identifying the effectiveness of 5S implementation on organizational performance as well. Surveying method is used and data collection is done by distributing questionnaire among five target organizations which have implemented 5S techniques.    The target organizations are chosen from different industries and diverse field of work. The results of this research obtained from a comparative measurement of organizational performance before and after 5S implementation. The cycle time has been declined to 3 hours from 10 hours.

Downloads

Download data is not yet available.

References

Deryasavimkorkut, NevzatCakicier (2009) “5s activity and its application at a sample company” journal of biotechnology Vol. 8(8), 1720-1728.

ArashGhodrati, NorzimaZulkifli (2013) “The Impact of Implementation on Industrial Organization Performance” journal of business and management invention vol. 2, 2319-8028.

www.gotopac.com

www.summitbizpro.com

Downloads

Published

2014-12-01

How to Cite

[1]
“CYCLE TIME REDUCTION IN ECONOMIZER MANUFACTURING USING 5S TECHNOLOGY: A CASE STUDY”, JME, vol. 9, no. 4, pp. 242–252, Dec. 2014, Accessed: Nov. 09, 2024. [Online]. Available: https://smenec.org/index.php/1/article/view/260

Similar Articles

1-10 of 267

You may also start an advanced similarity search for this article.