IMPLEMENTATION OF RELIABILITY CENTERED MAINTENANCE IN LAMP MANUFACTURING UNIT

Authors

  • Kumar Harmesh Dept. of Mechanical Engg., Shaheed Udham Singh College of Engineerng and Technology, Tangori, India.
  • Singh Rupinder Dept. of Production Engg., Guru Nanak Dev Engineering College, Ludhiana, India.
  • Bhangu N. S. Dept. of Electrical Engg., Guru Nanak Dev Engineering College, Ludhiana, India.
  • Pahuja G. L Dept. of Electrical Engg., National Institute of Technology, Kurukshetra, India.

Keywords:

Reliability centered maintenance, lamp manufacturing, down time, maintenance plan

Abstract

In today’s competitive environment many organizations are required to reduce their overall cost while maintaining the value and reliability of their assets. Reliability centered maintenance (RCM) helps organization to develop a systematic maintenance plan, meeting these requirements in a cost effective manner. This paper presents a case study of mechanical based failures in lamp manufacturing unit, which has significantly benefited through the successful implementation of RCM.  Due to consistent low machine efficiency, there was an urgent requirement for analysis of the maintenance system. The results of study suggested that as regards to down time of mechanical failures are concerned in lamp manufacturing unit; sealing, mounting, threading, pumping and stem machine contributes 27%, 23%, 15%, 10% and 7% respectively. The uptime efficiency for mechanical failures has been improved by 2% through the implementation of RCM.

Downloads

Download data is not yet available.

References

Backlund F and Hanuu J (2002), “ Can we make maintenance decision on risk analysis results”, Journal of Quality in Maintenance Engineering, Vol.8(1), pp 77-91.

Backlund F (2002), “Process and Requirements management aspects”, International Journal of Quality and Reliability Maintenance, Vol. 20(9), pp 7-14.

Daya M (2000), “You may need RCM to enhance TPM implementation”, Journal of Quality in Maintenance Engineering, Vol.6 (2), pp 82-85.

Horton M (1993), “Optimum Maintenance and Reliability Centred Maintenance”, Maintenance, Vol. l8(2), pp 8-13.

Knowles M (1995), “A Systematic Approach of Managing Risk; Reliability Centred Maintenance”, Maintenance, Vol.10 (1), pp 8-15.

Kumar H, Singh R and Mehta J (2008), “Application of Reliability Centered Maintenance in Lamp Manufacturing Unit”, In Proceeding of the International Conference on Recent Developments in Mechanical Engineering, SUS Engineering College, Tangori, Punjab, India, 23-25, pp 510-516.

Moubray H J (1985), “Reliability Centred Maintenance”, First edition, Butterworth Heinemann Ltd, England, pp 1-30.

Moubray J (1997), “Reliability Centred Maintenance” Second Edition, Butterworth Heinemann Ltd, London, England, pp 25-34.

Schawn C A and Khan I U (1994), “ Guidelines for Successful RCM Implementation”, In Proceedings of the ASME Joint International Power Generation Conference, Phoenix, AZ, pp 1-16.

Srikrishna S, Yadava G S and Rao P N (2005), “RCM Applied to Power Plant Auxiliaries”, Journal of Quality in Maintenance Engineering, Vol. 2(1), pp 3-14.

Downloads

Published

2009-09-01

How to Cite

[1]
“IMPLEMENTATION OF RELIABILITY CENTERED MAINTENANCE IN LAMP MANUFACTURING UNIT”, JME, vol. 4, no. 3, pp. 210–217, Sep. 2009, Accessed: Oct. 16, 2024. [Online]. Available: https://smenec.org/index.php/1/article/view/587

Similar Articles

11-20 of 262

You may also start an advanced similarity search for this article.